0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Seltenreintalbrücke Löbau
Official designation: S 115 Bw 0.1
Beginning of works: 1926
Completion: 1927
Status: in use

Project Type

Structure: Vaulted arch bridge
Material: Reinforced concrete bridge
Function / usage: Road bridge

Location

Location: , , ,
Coordinates: 51° 5' 29.23" N    14° 40' 5.48" E
Show coordinates on a map

Technical Information

Dimensions

total length 112.30 m
span lengths 32.65 m - 35.00 m - 32.65 m
number of spans 3

Cost

cost of construction Reichsmark 480 000

Materials

arches reinforced concrete
veneer stone

Participants

Initial construction (1926-1927)
Contractor
Reconstruction (1950-1951)
Contractor
Rehabilitation (2002)
Owner
Client
Original design
Co-contractor
Construction supervision

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20014439
  • Published on:
    16/11/2004
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine