General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Multiple T-section girder bridge |
Construction method: |
Precast girders with cast-in-situ slab |
Material: |
Prestressed concrete bridge |
Location
Location: |
Schwerte, Unna (Kreis), North Rhine-Westphalia, Germany |
---|---|
Address: | Reichshofstraße (K 21) |
Coordinates: | 51° 25' 4" N 7° 30' 43" E |
Technical Information
Dimensions
total length | 107.30 m | |
span lengths | 33.70 m - 39.00 m - 34.60 m | |
number of spans | 3 | |
bridge surface | 3 760 m² | |
total width | 35.92 m | |
deck | roadway / carriageway width | 2 x 15.14 m |
Quantities
foundations | reinforcing steel | 30 t |
total length of piles | 540 m | |
substructure | concrete volume | 3 650 m³ |
reinforcing steel | 300 t | |
superstructure | concrete volume | 2 800 m³ |
prestressing steel | 50 t | |
reinforcing steel | 620 t |
Materials
deck slab |
reinforced concrete
|
---|---|
girders |
precast prestressed concrete
|
Participants
Owner
Client
Design
Structural engineering
Geotechnical/geological experts
Checking engineering
- Hans J. Niebuhr (checking engineer)
Contractor
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2010. Bundesministerium für Verkehr, Bau und Stadtentwicklung, Berlin (Germany), pp. 69-94.
- About this
data sheet - Structure-ID
20060641 - Published on:
14/07/2011 - Last updated on:
05/02/2016