General Information
Completion: | 2000 |
---|---|
Status: | in use |
Project Type
Structure: |
Arch bridge |
---|---|
Function / usage: |
Pedestrian bridge (footbridge) |
Material: |
Timber bridge |
Location
Location: |
Finowfurt, Schorfheide, Barnim, Brandenburg, Germany |
---|---|
Crosses: |
|
Coordinates: | 52° 54' 11.57" N 13° 38' 58.85" E |
Technical Information
Dimensions
arch span | 28 m | |
deck | deck width | 2.50 m |
Cost
cost of construction | German Mark 620 000 |
Materials
deck |
Ekki-Azobe wood
|
---|---|
arch |
Ekki-Azobe wood
|
Participants
Owner
Design
Structural engineering
Checking engineering
Timber construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Einen Bogen ans andere Ufer schlagen. Fünfteilige Brücke über den Werbellinkanal. In: Bauen mit Holz, n. 9 (September 2001), pp. 26-29. (2001):
- About this
data sheet - Structure-ID
20006735 - Published on:
10/11/2002 - Last updated on:
05/02/2016