General Information
Status: | in use |
---|
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Material: |
Reinforced concrete bridge |
Support conditions: |
for registered users |
Structure: |
Rigid frame bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Malahide, Fingal, Ireland |
---|---|
Next to: |
Broadmeadow Viaduct (1968)
|
Coordinates: | 53° 27' 30.88" N 6° 9' 20.06" W |
Technical Information
Dimensions
total length | 176 m | |
span lengths | 2 x 12.192 m - 8 x 15.850 m - 2 x 12.192 m | |
number of spans | 12 | |
on-center distance between girders | 2.200 m | |
girder depth | 1.150 m | |
total width | 4.600 m | |
walkway width | 4.000 m |
Materials
deck |
reinforced concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Design Aspects of Integral Footbridges on Example of the Broadmeadow Estuary Footbridge. Presented at: 4th International Conference Footbridge 2011, Wroclaw, Poland, 6-8 July 2011. (2011):
- About this
data sheet - Structure-ID
20072332 - Published on:
26/12/2016 - Last updated on:
04/01/2017