0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Bridge to Hohenstein Power Station

General Information

Completion: 1927
Status: in use

Project Type

Structure: Tied-arch bridge
Function / usage: Road bridge
Material: Reinforced concrete bridge

Location

Location: , , ,
Address: Wetterstraße
Coordinates: 51° 25' 32.11" N    7° 20' 57.63" E
Show coordinates on a map

Technical Information

Materials

arch reinforced concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20018125
  • Published on:
    15/10/2005
  • Last updated on:
    05/06/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine