General Information
Completion: | 2003 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Location
Technical Information
Dimensions
total length | 192 m | |
deck | deck width | 8.8 m |
Materials
deck |
prestressed concrete
|
---|
Participants
Structural engineering
General contractor
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- 213 t DYWIDAG-Spannsysteme für Brücken in Muskat, Oman. Verkehrsentlastung in den Stadtbezirken Al-Khuwair und Al-Ghubrah, Muskat, Oman. In: DSI Info, n. 12 ( 2003- 2004), pp. 38.
- 213 t of DYWIDAG Post-Tensioning System for bridges in Muscat. Alleviation of traffic congestion in Al-Khuwair and Al-Ghubrah areas, Muscat, Sultanate of Oman. In: DSI Info, n. 12 ( 2003- 2004), pp. 44.
- 213 tonnes de précontrainte DYWIDAG pour des ponts à Muscat. Décharge du trafic dans les zones urbaines d'Al-Khuwair et d'Al-Ghubrah, Muscat, Oman. In: DSI Info, n. 12 ( 2003- 2004), pp. 38.
- About this
data sheet - Structure-ID
20011730 - Published on:
07/04/2004 - Last updated on:
05/02/2016