0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Breslauer Strasse Footbridge

General Information

Name in local language: Geh- und Radwegbrücke Breslauer Straße
Beginning of works: 1989
Completion: 1990
Status: demolished (13 August 2016)

Project Type

Location

Location: , ,
Address: Breslauer Straße
Coordinates: 49° 24' 30.95" N    11° 8' 16.78" E
Show coordinates on a map

Technical Information

Cost

Initial construction
cost of construction German Mark 1 300 000
Demolition
cost of demolition Euro 140 000

Materials

deck steel
pylons steel
abutments reinforced concrete
deck flooring wood

Participants

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20081296
  • Published on:
    18/08/2021
  • Last updated on:
    18/08/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine