0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1968
Status: in use

Project Type

Structure: Through truss bridge
Support conditions:
Function / usage: Railroad (railway) bridge
Material: Steel bridge
Plan view: Structurae Plus/Pro - Subscribe Now!

Location

Location: ,
,
Crosses:
  • Sava River
Coordinates: 44° 52' 6.24" N    18° 49' 51.46" E
Show coordinates on a map

Technical Information

Dimensions

total length 775.0 m
main bridge
main spans 92.0 m - 126.5 m - 92.0 m

Materials

truss steel
deck of approach viaducts prestressed concrete

Chronology

1992

One span is destroyed in the war.

1997

Bridge is completely repaired.

Participants

Reconstruction
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Tripalo, Branimir / Petković, Stanoje / Brusin, Siniša / Havran, Miroslav / Vlavić, Ljubomir (1998): Reconstruction of Railway Bridge across Sava River in Brcko Town. Presented at: 3. Internationale Donaubrückenkonferenz, 3rd International Conference on Bridges across the Danube, 29-30/10/1998, Regensburg, Germany, pp. 294-302.
  • About this
    data sheet
  • Structure-ID
    20003745
  • Published on:
    20/06/2002
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine