General Information
Official designation: | BW 16 |
---|---|
Beginning of works: | August 2020 |
Completion: | 10 September 2021 |
Status: | in use |
Project Type
Structure: |
Rigid frame bridge |
---|---|
Support conditions: |
for registered users |
Function / usage: |
Bicycle and pedestrian bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Wolfsburg, Lower Saxony, Germany |
---|---|
Address: | Braunschweiger Straße |
Coordinates: | 52° 23' 42.53" N 10° 44' 40.64" E |
Technical Information
Dimensions
span lengths | 20 m - 30 m | |
number of spans | 2 | |
deck | total width | 4.89 m |
walkway width | 4.00 m |
Cost
cost of construction | ca. Euro 3 500 000 |
Materials
superstructure |
prestressed concrete
(C 35/45)
|
---|---|
piers |
reinforced concrete
(C 35/45)
|
foundations |
reinforced concrete
(C 30/37)
|
abutments |
reinforced concrete
(C 35/45)
|
Participants
Owner
Design
Structural engineering
Soil investigation report
Checking engineering
- Joachim Göhlmann (checking engineer)
Contractor
Railing
Site supervision
Surveying
Lighting design
Relevant Web Sites
Relevant Publications
- Fuß- und Radwegbrücke in Wolfsburg. Ersatzneubau über die Braunschweiger Straße. In: Brückenbau, v. 14, n. 4 ( 2022), pp. 6-13. (2022):
- About this
data sheet - Structure-ID
20083973 - Published on:
29/10/2022 - Last updated on:
29/10/2022