General Information
Official designation: | OA 146 |
---|---|
Completion: | 2009 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Girder bridge |
Material: |
Composite bridge |
Location
Location: |
Trois-Bassins, Réunion |
---|---|
Part of: | |
Coordinates: | 21° 7' 32.80" S 55° 16' 52.46" E |
Technical Information
Dimensions
total length | 126 m | |
span lengths | 38 - 50 - 38 m | |
deck | deck width | 11.18 m / 11.82 m |
on-center distance between girders | 6.00 m | |
girder depth | 1.80 m | |
foundation slab P1 / P2 | dimensions at base | 7.40 m x 7.40 m |
thickness | 2.20 m | |
pier heads | width | 2.50 - 8.50 m |
height | 7.50 m | |
pier shafts | diameter | 2.50 m |
piers P1 | height | 20.45 m / 21.60 m |
piers P2 | height | 18.40 - 20.40 m |
Materials
deck |
composite
|
---|
Participants
Owner
- Ministère de l'Equipement, des Transports, du Logement, du Tourisme et de la Mer
- Région Réunion
- République Française
Client
Design
Co-contractor
Steel construction
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20018587 - Published on:
18/11/2005 - Last updated on:
05/02/2016