0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Status: project phase

Project Type

Structure: Box girder bridge
Function / usage: Road bridge
Material: Prestressed concrete bridge

Location

Location: , , ,

Technical Information

Dimensions

total length 8 839 m

Materials

deck prestressed concrete

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Mervine, Ralph (2006): Turning the tide. In: Bridge Design & Engineering, v. 12, n. 43 (2nd Quarter 2006), pp. 54-55.
  • About this
    data sheet
  • Structure-ID
    20006015
  • Published on:
    06/10/2002
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine