General Information
Completion: | June 2013 |
---|---|
Status: | in use |
Project Type
Structure: |
Girder bridge |
---|---|
Function / usage: |
Bicycle and pedestrian bridge |
Material: |
Timber bridge Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
main span | 80 m | |
total length | 135 m | |
length of drop-in span | 34 m | |
on-center distance between girders | 3.500 m | |
cantilever length | 40 m | |
walkway width | 4 m | |
deck | girder depth | 0.9 - 2.6 m |
Materials
deck |
glued laminated timber (glulam)
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
cross beams |
steel
|
Participants
Design
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Timber Footbridge over the Bow River in Banff. Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):
- About this
data sheet - Structure-ID
20071939 - Published on:
21/10/2016 - Last updated on:
13/07/2017