General Information
Name in local language: | Viadotto Bormida di Millesimo Nord |
---|---|
Completion: | 2001 |
Status: | in use |
Project Type
Construction method: |
Balanced cantilever method |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Structure: |
Box girder bridge |
Material: |
Prestressed concrete bridge |
Structure: |
Haunched girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Millesimo, Savona, Liguria, Italy |
---|---|
Address: | A 6 |
Part of: | |
Coordinates: | 44° 21' 19.66" N 8° 12' 18.96" E |
Technical Information
Dimensions
main span | 115 m | |
total length | 665 m | |
length | 410 m | |
span lengths | 75 m - 2 x 115 m - 65 m - 60 m | |
number of spans | 5 | |
height above valley floor or water | 65 m | |
pier | height | max. 70 m |
Materials
superstructure |
prestressed concrete
|
---|---|
deck |
prestressed concrete
|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Consulting engineers
Co-contractor
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Cantilever segmental bridges prestressed with DYWIDAG Strand-Post-Tensioning Systems. Widening of the Torino-Savona Expressway by two lanes, Millesimo, Savona, Italy. In: DSI Info, n. 11 ( 2002- 2003), pp. 23.
- Freivorbaubrücken mit DYWIDAG-Litzenspannsystemen gesichert. Zweispuriger Ausbau der Autobahn Torino-Savona, Millesimo (Savona), Italien. In: DSI Info, n. 11 ( 2002- 2003), pp. 23.
- Ponts d'autoroute en encorbellement – précontrainte DYWIDAG toron. Deuxième voie pour l'autoroute Torino-Savona, Millesimo, Savona, Italie. In: DSI Info, n. 11 ( 2002- 2003), pp. 23.
- About this
data sheet - Structure-ID
20034372 - Published on:
11/02/2008 - Last updated on:
07/10/2020