General Information
Other name(s): | Wele River Bridge, Rio Benito Bridge |
---|---|
Completion: | August 2012 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Cable-stayed bridge with semi-fan system |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Mbini, Equatorial Guinea Bolondo, Equatorial Guinea |
---|---|
Coordinates: | 1° 35' 12.11" N 9° 37' 34.98" E |
Technical Information
Dimensions
total length | 1 057 m | |
number of lanes | 2 x 2 | |
pylon | height | > 80 m |
Design Loads
wind load | 14 m/s |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20066329 - Published on:
05/08/2014 - Last updated on:
05/02/2016