0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1939
Status: in use

Project Type

Structure: Truss bridge
Function / usage: Road bridge

Location

Location: , ,
Location description:

Over Blevens Creek

Coordinates: 34° 12' 49.64" N    87° 5' 56.50" W
Show coordinates on a map

Technical Information

Dimensions

total length 30.51 m

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20032417
  • Published on:
    21/10/2007
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine