General Information
Official designation: | BW 2.07 |
---|---|
Completion: | 2000 |
Status: | in use |
Project Type
Structure: |
Tied-arch bridge |
---|---|
Function / usage: |
Railroad (railway) bridge |
Construction method: |
Lateral / transverse launching |
Material: |
Steel bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Support conditions: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Lübeck, Schleswig-Holstein, Germany |
---|---|
Crosses: |
|
Part of: | |
Crosses: |
A 20 Motorway (Germany)
|
Coordinates: | 53° 47' 3.51" N 10° 42' 14" E |
Technical Information
Dimensions
span | 50 m | |
number of spans | 1 | |
bridge surface | 390.00 m² | |
number of tracks | 1 | |
track gauge | 1 435 mm | |
abutments | number | 2 |
arch | rise | 8.30 m |
deck | deck width | 6.30 m |
girder depth | 0.74 m |
Materials
deck |
steel
|
---|---|
arches |
steel
|
abutments |
reinforced concrete
|
Participants
Relevant Web Sites
- About this
data sheet - Structure-ID
20008633 - Published on:
18/03/2003 - Last updated on:
16/10/2017