General Information
Completion: | 2008 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Box girder bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
total length | 380 m | |
span lengths | 47.5 m - 5 x 57 m - 47.5 m | |
number of spans | 7 | |
height above valley floor or water | max. 55 m | |
girder depth | 3.1 m | |
piers | width | 3.4 m |
height | max. 52 m | |
thickness | 1.4 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Base-Line-gestützte Verformungsmessungen an einer semi-integralen Hohlkastenbrücke. In: Bautechnik, v. 91, n. 2 (February 2014), pp. 107-113. (2014):
- (2010): Durable and robust concrete bridges for the PPP-project E18 in Norway. Presented at: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, pp. 770-771.
- About this
data sheet - Structure-ID
20058447 - Published on:
02/10/2010 - Last updated on:
05/02/2016