Name in local language: | Geratalbrücke Bischleben |
---|---|
Beginning of works: | 2002 |
Completion: | 2005 |
Status: | in use |
Project Type
Function / usage: |
High-speed rail bridge |
---|---|
Structure: |
main bridge: Tied-arch bridge |
Material: |
main bridge: Steel bridge Structurae Plus/Pro - Subscribe Now! approach viaduct: Prestressed concrete bridge |
Structure: |
approach viaduct: Single T-section girder bridge |
Location
Location: |
Erfurt, Thuringia, Germany |
---|---|
Crosses: |
|
Part of: |
|
Coordinates: | 50° 56' 31.35" N 10° 59' 16.61" E |
Technical Information
Dimensions
total length | 322.60 m | |
approach viaduct | ||
---|---|---|
span lengths | 18 - 20 m | |
number of spans | 13 | |
girder depth | 1.25 m | |
main bridge | ||
girder depth | 2.9 m | |
arch | span | 78.3 m |
Cost
cost of construction | Euro 6 000 000 |
Materials
piers |
reinforced concrete
|
---|---|
arch |
steel
|
deck of approach viaducts |
prestressed concrete
|
abutments |
reinforced concrete
|
Chronology
10 December 2017 | Opened to traffic along with the entire high-speed rail line from Nuremberg to Erfurt. |
---|
Participants
Original design
Structural engineering
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20020216 - Published on:
24/03/2006 - Last updated on: