General Information
Project Type
Structure: |
Two-hinged arch bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Cantilever construction using temporary cable-stays |
Material: |
Steel bridge |
Location
Technical Information
Dimensions
width | 10 m | |
rise | 66.00 m | |
span lengths | 18.30 m - 12.20 m - 329.40 m - 18.30 m | |
clearance | 15.20 m | |
number of spans | 4 | |
arch span | 329.40 m |
Materials
deck |
steel
|
---|---|
arch |
steel
|
Chronology
20 December 1935 | Inauguration by Sir Herbert Stanley. |
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- The Design and Erection of the Birchenough and Otto Beit Bridges, Rhodesia. In: Journal of the Institution of Civil Engineers, v. 24, n. 7 (May 1945), pp. 171-195. (1945):
- Les grands ponts du monde: Hors d'Europe. Brissaud, Poitiers (France), pp. 42. (1990):
- Le pont-route de Birchenough sur la Sabi (Rhodésie du Sud). In: Ossature métallique, v. 5 (April 1936), pp. 180-184.
- Le pont-route de Birchenough sur le Sabi (Rhodésie du Sud). In: La Technique des Travaux, v. 12, n. 10 (October 1936), pp. 551-555. (1936):
- Tierra sobre el agua. Visión histórica universal de los puentes. Colegio de Ingenieros de Caminos, Canales y Puertos, Madrid (Spain), pp. 341-342. (1999):
- About this
data sheet - Structure-ID
20002255 - Published on:
11/11/2001 - Last updated on:
05/02/2016