General Information
Project Type
Structure: |
Shell |
---|---|
Function / usage: |
Stadium / Arena Museum building |
Location
Technical Information
Quantities
concrete volume | 12 000 m³ | |
prestressing steel | 386 t |
Materials
shell |
prestressed concrete
|
---|
Chronology
27 August 1974 | Works on the velodrome begin. |
---|
Notes
As the velodrome was not being used sufficiently after the Olympic games it was subsequently converted into its current function. It now serves as a zoological facility showing various habitats of the world from the arctic to the tropics.
Participants
Relevant Web Sites
- About this
data sheet - Structure-ID
20003511 - Published on:
10/06/2002 - Last updated on:
03/03/2022