General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Cable-stayed bridge with semi-fan system |
Material: |
Composite bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
main span | 250 m | |
total length | 1 347 m | |
deck | width | 22.5 m |
pylon | pylon height | 101.6 m |
main bridge | ||
---|---|---|
span lengths of main bridge | 100 m - 250 m - 100 m |
Materials
deck |
composite
|
---|
Chronology
13 May 2005 | Opened to the public. |
---|
Participants
Design
Co-contractor
Formwork
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Going into overdrive. A new cable-stayed bridge being built in Vietnam is due to open later this year. In: Bridge Design & Engineering, v. 11, n. 38 (1st Quarter 2005), pp. 44.
- About this
data sheet - Structure-ID
20005103 - Published on:
17/09/2002 - Last updated on:
05/02/2016