0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1937
Status: in use

Project Type

Location

Location: , , ,
Coordinates: 36° 4' 12" N    121° 35' 53.98" W
Show coordinates on a map

Technical Information

Dimensions

total length 152.4 m

Materials

deck reinforced concrete
piers reinforced concrete
arches reinforced concrete
abutments reinforced concrete

Chronology

1999

Seismic retrofit.

Notes

Prison labor was used in the construction of the bridge.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20016625
  • Published on:
    15/06/2005
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine