General Information
Name in local language: | Weserbrücke Beverungen |
---|---|
Beginning of works: | November 2017 |
Completion: | July 2020 |
Status: | in use |
Project Type
Structure: |
Unbraced tied-arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel-reinforced concrete composite bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Construction method: |
Lateral / transverse launching |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Beverungen, Höxter (Kreis), North Rhine-Westphalia, Germany Lauenförde, Holzminden (Kreis), Lower Saxony, Germany |
---|---|
Crosses: |
|
Replaces: |
Beverungen Bridge (1950)
|
Coordinates: | 51° 39' 43.78" N 9° 22' 42.77" E |
Technical Information
Dimensions
main span | 65.10 m | |
width | 14.90 m | |
total length | 199.90 m | |
span lengths | 2 x 32.40 m - 2 x 35.00 m - 65.10 m | |
number of spans | 5 | |
bridge surface | 2 398.80 m² | |
deck | deck depth | 0.64 - 0.72 m |
Quantities
substructure | concrete volume | 2 198 m³ |
reinforcing steel | 365 t | |
superstructure | structural steel | 938 t |
concrete volume | 1 041 m³ | |
reinforcing steel | 294 t | |
shear studs | 9 t |
Design Loads
live load | LM 1 (DIN EN 1991-2) | |
design code(s) | DIN EN 1991-2 |
Cost
cost of construction | Euro 17 300 000 |
Materials
piers |
reinforced concrete
|
---|---|
arches |
steel
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Design
Detailed design
Soil investigation report
Checking engineering
- Jürgen Uhlendahl (checking engineer)
Co-contractor
Steel construction
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2021. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2021, pp. 39-53.
- About this
data sheet - Structure-ID
20074448 - Published on:
31/12/2017 - Last updated on:
20/08/2022