General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Besseringen, Merzig, Merzig-Wadern, Saar, Germany |
---|---|
Crosses: |
|
Coordinates: | 49° 27' 48.32" N 6° 36' 48.79" E |
Technical Information
Dimensions
total length | 222.00 m | |
span lengths | 61.95 m - 98.10 m - 61.95 m | |
number of spans | 3 | |
bridge surface | 2 553 m² | |
deck | deck width | 11.50 m |
Quantities
prestressing steel | 125.2 t |
Cost
cost of construction | German Mark 8 350 000 |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
foundations |
reinforced concrete
|
Participants
Owner
Client
Original design
Structural engineering
Checking engineering
- Tilman Zichner (checking engineer)
Co-contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2001. Deutscher Bundes-Verlag, Bonn (Germany), 2001, pp. 121-133.
- About this
data sheet - Structure-ID
20004066 - Published on:
02/07/2002 - Last updated on:
05/02/2016