0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Tunnel Bertoldshofen
Beginning of works: 25 February 2019
Completion: End of 2021
Status: under construction

Project Type

Structure: Tunnel
Function / usage: Road tunnel
Construction method: Excavation by excavator
New Austrian Tunnelling Method (NATM)

Location

Location: , , ,
Address: B 472
Coordinates: 47° 46' 57.14" N    10° 40' 0.09" E
Coordinates: 47° 47' 13.50" N    10° 39' 50.34" E
Show coordinates on a map

Technical Information

Dimensions

length 599 m
tunnel section area 100 m² (130 m²)
number of lanes 2 x 1
number of tubes 1

Cost

cost of construction Euro 23 500 000

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20076895
  • Published on:
    26/02/2019
  • Last updated on:
    01/06/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine