0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: June 2003
Completion: 14 July 2008
Duration of works: 60 months
Status: in use

Project Type

Function / usage: Road tunnel
Structure: Tunnel
Construction method: Cut-and-cover method

Location

Location: , ,
Address: B 236
Coordinates: 51° 28' 27.19" N    7° 32' 46.98" E
Coordinates: 51° 28' 54.13" N    7° 31' 53.21" E
Show coordinates on a map

Technical Information

Dimensions

width max. 22.3 m
length 1 310 m

Quantities

concrete volume 68 500 m³
reinforcing steel 6 950 t
excavated material 120 000 m³
shotcrete 13 500 m²

Cost

cost of construction Euro 63 000 000
tunnel cost of construction Euro 48 000 000

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20038029
  • Published on:
    12/07/2008
  • Last updated on:
    02/05/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine