Belgrade Bypass Sava River Bridge

General Information

Beginning of works: 11 November 1990
Completion: 1998
Status: in use

Project Type

Location

Location: ,
Crosses:
  • Sava River
Coordinates: 44° 44' 31.72" N    20° 19' 8.62" E
Show coordinates on a map

Technical Information

Dimensions

total length 1 789.60 m
span lengths 100.25 m - 198.00 m - 2 x 99.00 m - 89.25 m
number of spans 5
deck deck width 2 x 14.30 m
main bridge
length 587.90 m

Materials

superstructure steel
piers reinforced concrete
deck of approach viaducts prestressed concrete

Chronology

November 1990

Construction begins.

1993 — 1997

Construction interrupted.

1999

The bridge is bombarded and partially destroyed two weeks before the scheduled opening.

2002

The Roads Directorate secures funding for the reconstruction of the bridge.

Participants

Design
Structural engineering
Contractor
Reconstruction
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20003740
  • Published on:
    20/06/2002
  • Last updated on:
    05/02/2016