0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2 June 2007
Completion: 11 May 2010
Status: in use

Project Type

Function / usage: Hydroelectric dam / plant
Structure: power plant:
Cavern
Construction method: tunnels:
Tunnel boring machine (TBM)

Location

Location: ,
Coordinates: 11° 49' 10" N    36° 55' 8" E
Show coordinates on a map

Technical Information

Dimensions

headrace tunnel length 11 822 m
excavation diameter 8.100 m
tailrace tunnel length 7 202 m
excavation diameter 8.070 m

Participants

Structural engineering
TBM manufacturer
Hydraulic consultant

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20065911
  • Published on:
    26/01/2014
  • Last updated on:
    25/07/2014
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine