General Information
Name in local language: | Grünbrücke bei Beelitz |
---|---|
Official designation: | BW 1Ü1 |
Beginning of works: | 2016 |
Completion: | 2018 |
Status: | in use |
Project Type
Function / usage: |
Wildlife crossing |
---|---|
Material: |
Steel-reinforced concrete composite bridge |
Structure: |
Rigid frame bridge |
Location
Location: |
Beelitz, Potsdam-Mittelmark, Brandenburg, Germany |
---|---|
Crosses: |
A 9 Motorway (Germany)
|
Coordinates: | 52° 14' 30.12" N 12° 55' 0.30" E |
Technical Information
Dimensions
span | 46.00 m | |
bridge surface | 2 765 m² | |
superstructure | deck depth | 1.60 m |
deck width | 59.50 - 62.95 m | |
deck slab thickness | 0.25 m |
Quantities
structural steel | 456 t | |
concrete volume | 5 400 m³ | |
reinforcing steel | 790 t | |
shear studs | 17 t |
Cost
cost of construction | ca. Euro 4 600 000 |
Materials
deck slab |
reinforced concrete
|
---|---|
abutments |
reinforced concrete
|
girders |
steel
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Chronik des Brückenbaus. Presented at: 29. Dresdener Brückenbausysmposium, 11./12. März 2019, Dresden (Germany), pp. 197-208. (2019):
- About this
data sheet - Structure-ID
20077194 - Published on:
04/04/2019 - Last updated on:
04/04/2019