General Information
Completion: | 1995 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
South Korea |
---|
Technical Information
Dimensions
span lengths | 86 m - 5 x 128 m - 86 m | |
number of spans | 7 | |
deck | deck width | 8.2 m |
Quantities
prestressing steel | 430 t |
Materials
superstructure |
prestressed concrete
|
---|
Participants
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bridge Connection to Isolated Island. In: VSL News, v. 5, n. 2 ( 1994), pp. 8. (1994):
- About this
data sheet - Structure-ID
20004115 - Published on:
03/07/2002 - Last updated on:
05/02/2016