0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: June 2006
Completion: May 2008
Duration of works: 24 months
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Autobahn A4
Coordinates: 50° 52' 47" N    11° 37' 12" E
Show coordinates on a map

Technical Information

Dimensions

total length 85.92 m
span lengths 2 x 42.96 m
number of spans 2
bridge surface 2 341 m²
crossing angle 42.980 gon
deck deck width 27.25 m
on-center distance between girders 2.728 m
deck slab thickness 0.30 m
girder depth 1.50 m
roadway / carriageway width 10.75 m + 7.50 m
walkway width 2 x 3.75 m

Quantities

deck structural steel 460 t
concrete volume 900 m³
reinforcing steel 162 t
substructure concrete volume 2 770 m³
reinforcing steel 300 t

Cost

cost of construction Euro 3 900 000

Materials

deck slab reinforced concrete
abutments reinforced concrete
pier reinforced concrete
girders steel

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20064775
  • Published on:
    20/03/2013
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine