General Information
Project Type
Structure: |
Arch bridge |
---|---|
Function / usage: |
Bicycle and pedestrian bridge |
Material: |
Steel bridge |
Location
Technical Information
Dimensions
total length | 59.00 m | |
arch | arch span | 45.804 m |
depth | 0.70 - 1.90 m | |
deck | walkway width | 2 x 2.00 m |
Quantities
substructure | concrete volume | 242 m³ |
reinforcing steel | 19.5 t | |
superstructure | structural steel | 55 t |
concrete volume | 160 m³ | |
reinforcing steel | 36 t |
Cost
cost of construction | Euro 700 000 |
Materials
girder |
steel
|
---|---|
arch |
steel
|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
cross beams |
steel
|
springings |
reinforced concrete
|
Participants
Owner
Client
Design
Architecture
- Ralf Schüler (architectural consultant)
- Ursulina Schüler-Witte (architectural consultant)
Structural engineering
Geotechnical/geological experts
Checking engineering
- G. Pratsch (checking engineer)
Contractor
Construction management
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2011. Bundesministerium für Verkehr, Bau und Stadtentwicklung, Berlin (Germany), 2011, pp. 93-112.
- About this
data sheet - Structure-ID
20064776 - Published on:
20/03/2013 - Last updated on:
05/02/2016