General Information
Other name(s): | Art'otel London Battersea Power Station; Battersea Power Station Redevelopment Phase 3 |
---|---|
Beginning of works: | June 2018 |
Completion: | 2022 |
Status: | under construction (topped-out) |
Project Type
Function / usage: |
Residential building Hotel |
---|
Location
Location: |
Battersea, Wandsworth, London, England, United Kingdom |
---|---|
Address: | 1 Electric Boulevard |
Coordinates: | 51° 28' 48.91" N 0° 8' 42.69" W |
Technical Information
Dimensions
number of floors (above ground) | 17 |
Materials
frame structure |
reinforced concrete
|
---|
Participants
Architecture
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20083149 - Published on:
22/06/2022 - Last updated on:
22/06/2022