General Information
Official designation: | BW 2813/16 |
---|---|
Beginning of works: | June 1995 |
Completion: | March 1996 |
Duration of works: | 9 months |
Status: | in use |
Project Type
Structure: |
Slab bridge |
---|---|
Function / usage: |
Wildlife crossing |
Material: |
Prestressed concrete bridge |
Construction method: |
In-situ casting on falsework |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Barnekow, Amt Dorf Mecklenburg-Bad Kleinen, Nordwestmecklenburg, Mecklenburg-Western Pomerania, Germany |
---|---|
Crosses: |
|
Part of: | |
Coordinates: | 53° 51' 22.38" N 11° 22' 58.85" E |
Technical Information
Dimensions
width | 39.50 m | |
length | 36.75 m | |
span lengths | 19.25 m - 17.50 m | |
clearance | > 4.70 m | |
number of spans | 2 | |
bridge surface | 1 452 m² | |
deck | deck depth | 0.90 - 1.20 m |
Cost
cost of construction | German Mark 5 600 000 | |
cost of construction per m² | German Mark 3 300 |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
prestressed concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Original design
Design consultants
- Joachim Desczyk (design consultant)
Structural engineering
Checking engineering
- Ruffer (checking engineer)
Contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brückenbauwerke in den neuen Bundesländern. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), 2004, pp. 101-105.
- About this
data sheet - Structure-ID
20017970 - Published on:
06/10/2005 - Last updated on:
09/02/2018