0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: 반포대교 / 盤浦大橋 (Banpo daegyo / Panp‘o taekyo)
Beginning of works: 11 January 1980
Completion: 25 June 1982
Status: in use

Project Type

Structure: Girder bridge
Function / usage: Road bridge
Material: Structurae Plus/Pro - Subscribe Now!

Location

Location: ,
Crosses:
  • Han River
Coordinates: 37° 30' 54.28" N    126° 59' 46.71" E
Show coordinates on a map

Technical Information

Dimensions

total length 1 495 m
deck deck width 28 m

Materials

piers reinforced concrete
girders steel

Participants

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20006573
  • Published on:
    06/11/2002
  • Last updated on:
    06/06/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine