0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Official designation: BW 2a
Beginning of works: 2014
Completion: 2015
Status: in use

Project Type

Location

Location: , , ,
Coordinates: 51° 25' 19.08" N    12° 22' 41.55" E
Show coordinates on a map

Technical Information

Dimensions

width 11.60 m
total length 53.40 m
span lengths 19.60 m - 21.90 m - 19.60 m
number of spans 3
bridge surface 619 m²
deck girder depth 1.30 m

Quantities

structural steel 29 t
concrete volume 174 m³
reinforcing steel 20 t
shear studs 1 t

Design Loads

live load LM 1 (DIN EN 191-2/NA)
design code(s) DIN EN 191-2/NA; DIN-FB 101; STANAG 2021

Cost

cost of construction ca. Euro 1 740 000

Materials

piers reinforced concrete
deck slab reinforced concrete
abutments reinforced concrete
girders steel
precast prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Wellner, Sabine (2016): Chronik des Brückenbaus. In: Curbach, Manfred (2016): 26. Dresdner Brückenbausymposium. Institut für Massivbau, Technische Universität Dresden, Dresden (Germany), ISBN 978-3-86780-544-5, pp. 283-310.
  • About this
    data sheet
  • Structure-ID
    20074927
  • Published on:
    22/03/2018
  • Last updated on:
    22/03/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine