General Information
Completion: | 1902 |
---|---|
Status: | in use |
Project Type
Structure: |
Deck truss bridge |
---|---|
Function / usage: |
Road bridge Railroad (railway) bridge |
Material: |
Steel bridge |
Location
Location: |
Seddon, Marlborough, New Zealand |
---|---|
Crosses: |
|
Next to: |
Awatere Bridge (2008)
|
Coordinates: | 41° 39' 30.86" S 174° 4' 38.65" E |
Technical Information
Dimensions
span lengths | 13.4 m - 18.3 m - 2 x 22.9 m - 8 x 27.4 m | |
number of spans | 12 |
Materials
truss |
steel
|
---|---|
abutments |
concrete
|
girders |
steel
|
Participants
Relevant Web Sites
Relevant Publications
- Bridging the Gap. Early Bridges in New Zealand 1830-1939. Reed Books, Auckland (New Zealand). (2001):
- About this
data sheet - Structure-ID
20005433 - Published on:
23/09/2002 - Last updated on:
13/07/2016