0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1969
Completion: 1971
Status: in use

Project Type

Location

Location: , , ,
Carries: A 620 Motorway (Germany)
Coordinates: 49° 16' 9.17" N    6° 48' 20.82" E
Show coordinates on a map

Technical Information

Dimensions

bridge surface 2 553 m²
total width 19.27 m
Northern bridge
total length 132.42 m
span lengths 17.98 m - 35.07 m - 35.08 m - 20.49 m - 23.80 m
number of spans 5
Southern bridge
total length 132.54 m
span lengths 18.01 m - 20.51 m - 35.12 m - 35.10 m - 23.80 m
number of spans 5
Strengthening
micropiles total length 1 564.00 m

Quantities

superstructure structural steel 2 t
Strengthening
substructure concrete volume 750 m³
reinforcing steel 65 t
superstructure concrete volume 206 m³
reinforcing steel 28 t

Design Loads

Strengthening
live load LM1
design code(s) DIN Fachbericht 101

Cost

Strengthening
cost of construction ca. Euro 5 100 000

Materials

superstructure prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20085742
  • Published on:
    20/04/2023
  • Last updated on:
    20/04/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine