General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Box girder bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Wadgassen, Saarlouis (Kreis), Saar, Germany |
---|---|
Carries: |
A 620 Motorway (Germany)
|
Coordinates: | 49° 16' 9.17" N 6° 48' 20.82" E |
Technical Information
Dimensions
bridge surface | 2 553 m² | |
total width | 19.27 m | |
Northern bridge | ||
---|---|---|
total length | 132.42 m | |
span lengths | 17.98 m - 35.07 m - 35.08 m - 20.49 m - 23.80 m | |
number of spans | 5 | |
Southern bridge | ||
total length | 132.54 m | |
span lengths | 18.01 m - 20.51 m - 35.12 m - 35.10 m - 23.80 m | |
number of spans | 5 | |
Strengthening | ||
micropiles | total length | 1 564.00 m |
Quantities
superstructure | structural steel | 2 t |
Strengthening | ||
---|---|---|
substructure | concrete volume | 750 m³ |
reinforcing steel | 65 t | |
superstructure | concrete volume | 206 m³ |
reinforcing steel | 28 t |
Design Loads
Strengthening | ||
---|---|---|
live load | LM1 | |
design code(s) | DIN Fachbericht 101 |
Cost
Strengthening | ||
---|---|---|
cost of construction | ca. Euro 5 100 000 |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Initial construction (1969-1971)
Owner
Client
Strengthening (2019-2020)
Owner
Client
Design
Structural engineering
Checking engineering
Contractor
Construction management
Site supervision
Relevant Web Sites
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2022. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2022, pp. 103-118.
- About this
data sheet - Structure-ID
20085742 - Published on:
20/04/2023 - Last updated on:
20/04/2023