0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Great Granite Dam
Completion: 1892
Status: destroyed (7 April 1900)

Project Type

Structure: Gravity dam
Function / usage: Hydroelectric dam / plant
Material: Masonry dam

Location

Location: , , ,
Impounded:
  • Colorado River (Texas)
Coordinates: 30° 17' 40" N    97° 47' 11" W
Show coordinates on a map

Technical Information

Dimensions

height 20.7 m
length 332.54 m

Materials

dam structure masonry

Chronology

7 April 1900, 11:20

Dam is overtopped by over 3 meters of water during a flood. The dam collapses over a length of ca. 150 meters and almost its entire height, releasing almost all the water in the reservoir.

Excerpt from Wikipedia

The Austin Dam, also referred to as "The Great Granite Dam" failure was a catastrophic dam failure near Austin, Texas that killed several dozen people in 1900. The destruction of the dam drained the Lake McDonald reservoir and left the city of Austin without electrical power for a number of months.

"At 11.20 a.m. on April 7, when the lake level had reached a height of 11.07 feet above the crest of the dam, the dam gave way at a point . . . about 300 feet from the east end of the dam. Observers [at three different points] all agree in their testimony that it first opened [at the point about 300 feet from the east end of the dam], and as though the mad current had simply pushed its way through the structure. Sooner than it takes to write these words the two sections . . . each about 250 feet long, were shoved or pushed into the lower positions . . . , about 60 feet from their former positions in the dam. There was not the slightest overturning. . . . As soon as the sections were broken out . . . , the partially pent-up waters rushed through the gap, those held back by [the intact section] producing a strong current in the direction of the power house. This current struck the wall of the power house almost on a level with the floor of the pump room (about 12 feet below the crest of the dam), crushed in all of the windows on the west side, flooded all of the lower stories, and caught and drowned five employees and three small boys. Two of the employees miraculously escaped by climbing through a belt hole in the dynamo room. These workmen were pumping water from the lower portions of the power house."

Subsequent attempts to rebuild the dam were unsuccessful. The dam was finally replaced by the Tom Miller Dam in the 1940s.

Text imported from Wikipedia article "Austin Dam failure" and modified on April 20, 2020 according to the CC-BY-SA 4.0 International license.

Participants

(role unknown)

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20003709
  • Published on:
    18/06/2002
  • Last updated on:
    08/12/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine