0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Atchafalaya River Pipeline Bridge

General Information

Completion: 17 October 1951
Status: in use

Project Type

Location

Location: , ,
, , ,
Crosses:
  • Atchafalaya River
Coordinates: 30° 42' 33.35" N    91° 44' 9.31" W
Show coordinates on a map

Technical Information

Dimensions

main span 609.6 m
span lengths 170.08 m - 304.8 m - 609.6 m - 198.12 m - 143.26 m
number of spans 5

Cost

cost of construction United States dollar 2 003 881

Materials

cables steel wire
deck steel
pylons steel

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20080838
  • Published on:
    28/03/2021
  • Last updated on:
    28/03/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine