General Information
Completion: | 2000 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Incremental launching with temporary cable-stays |
Material: |
Prestressed concrete bridge |
Location
Technical Information
Dimensions
total length | 375 m | |
span lengths | 67.5 m - 3 x 80 m - 67.5 m | |
number of spans | 5 | |
pier height | max. 81 m | |
deck | deck width | 26.6 m |
Materials
deck |
reinforced concrete
|
---|---|
girder |
steel
|
Participants
Design
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20005013 - Published on:
16/09/2002 - Last updated on:
05/02/2016