0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2003
Completion: 2006
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Henares
Coordinates: 40° 39' 16" N    3° 10' 11" W
Show coordinates on a map

Technical Information

Dimensions

main span 100.50 m
width 30.00 m
total length 201.00 m
deck girder depth 2.5 m
roadway / carriageway width 2 x 12.50 m
pylon pylon height (above deck) 60.00 m
stay cables number 28

Materials

pylon steel
deck composite steel-reinforced concrete
piles reinforced concrete
stay cables steel wire

Participants

Design
Architecture
Structural engineering
Engineering
Contractor
(role unknown)

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Sánchez de León, Ramón / Bernal Pérez, Christian (2008): Puente atirantado "Arriaca" en Guadalajara. Presented at: IV Congreso de la Asociación Científico-Tecnica del Hormigón Estructural - Congreso Internacional de Estructuras, Valencia, 24-27.11.2008.
  • Singular solution. In: Bridge Design & Engineering, v. 12, n. 45 (4th Quarter 2006), pp. 13.
  • Peña Pascual, José Manuel / Fuertes Kronberg, Carlos (2008): Últimas realizaciones en puentes atirantados. Presented at: IV Congreso de la Asociación Científico-Tecnica del Hormigón Estructural - Congreso Internacional de Estructuras, Valencia, 24-27.11.2008.
  • About this
    data sheet
  • Structure-ID
    20025646
  • Published on:
    10/12/2006
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine