General Information
Project Type
Structure: |
Deck arch bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Cantilever construction using temporary stays in vertical position, then rotation into horizontal |
Material: |
Reinforced concrete bridge |
Location
Location: |
Maierhöfen, Lindau (Kreis), Bavaria, Germany Grünenbach, Lindau (Kreis), Bavaria, Germany |
---|---|
Crosses: |
|
Coordinates: | 47° 38' 30.16" N 10° 1' 41.44" E |
Technical Information
Dimensions
total length | 230 m | |
arch span | 150.00 m | |
height above valley floor or water | 56.00 m |
Materials
arch |
reinforced concrete
|
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Argentobel Bridge, FRG: New construction method for arches. Presented at: 12th IABSE Congress, Vancouver, BC, Canada, 3-7 September, 1984. (1984):
- Bogenbrücke in neuem Klappverfahren. Brückenteile werden senkrecht gefertigt. In: beton, n. 5 ( 1984), pp. 200.
- Les grands ponts du monde: Ponts remarquables d'Europe. Brissaud, Poitiers (France), pp. 116-117. (1990):
- About this
data sheet - Structure-ID
20008247 - Published on:
14/02/2003 - Last updated on:
05/02/2016