0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Talbrücke Arensburg
Beginning of works: 1985
Completion: 1989
Duration of works: 4 years
Status: in use

Project Type

Location

Location: , , ,
, , ,
Carries:
  • Autobahn A2
Part of:
Carries: A 2 Motorway (Germany)
Coordinates: 52° 13' 11.44" N    9° 7' 4.29" E
Show coordinates on a map

Technical Information

Dimensions

total length 561.9 m
span lengths 31.0 m - 33.0 m - 13 x 38.3 m
number of spans 15
bridge surface 10 564 m²
deck deck width 18.8 m

Quantities

concrete volume 15 200 m³
prestressing steel 300 t
reinforcing steel 1 400 t

Design Loads

live load Brückenklasse 60/30
design code(s) DIN 1072

Cost

cost of construction ca. German Mark 17 900 000
cost of construction per m² German Mark 1 750

Materials

deck prestressed concrete
piers reinforced concrete

Participants

Owner
Client
Structural engineering
Geotechnical/geological experts
Checking engineering
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001138
  • Published on:
    25/11/2000
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine