0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Archbishop Tadeusz Gocłowski Tunnel

General Information

Name in local language: Tunel imienia Ks. Abp. Tadeusza Gocłowskiego; Tunel pod Martwą Wisłą
Other name(s): Tunnel under the dead Vistula
Beginning of works: October 2011
Completion: 24 April 2016
Status: in use

Project Type

Function / usage: Road tunnel
Structure: Tunnel
Construction method: Tunnel boring machine (TBM)

Location

Location: , ,
Underneath of:
  • Vistula River
Coordinates: 54° 22' 46.84" N    18° 40' 20.01" E
Coordinates: 54° 23' 11.23" N    18° 39' 15.41" E
Show coordinates on a map

Technical Information

Dimensions

total length 2 155 m
tunnel length 1 377.5 m
length of bored tunnels 1 072.5 m
number of tubes 2
TBM diameter 12.560 m

Cost

cost of construction Polish Zloty 885 000 000

Materials

tunnel precast reinforced concrete

Participants

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20083012
  • Published on:
    02/06/2022
  • Last updated on:
    03/06/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine