General Information
Name in local language: | Tunel imienia Ks. Abp. Tadeusza Gocłowskiego; Tunel pod Martwą Wisłą |
---|---|
Other name(s): | Tunnel under the dead Vistula |
Beginning of works: | October 2011 |
Completion: | 24 April 2016 |
Status: | in use |
Project Type
Function / usage: |
Road tunnel |
---|---|
Structure: |
Tunnel |
Construction method: |
Tunnel boring machine (TBM) |
Location
Location: |
Gdansk, Pomeranian Voivodeship, Poland |
---|---|
Underneath of: |
|
Coordinates: | 54° 22' 46.84" N 18° 40' 20.01" E |
Coordinates: | 54° 23' 11.23" N 18° 39' 15.41" E |
Technical Information
Dimensions
total length | 2 155 m | |
tunnel length | 1 377.5 m | |
length of bored tunnels | 1 072.5 m | |
number of tubes | 2 | |
TBM | diameter | 12.560 m |
Cost
cost of construction | Polish Zloty 885 000 000 |
Materials
tunnel |
precast reinforced concrete
|
---|
Participants
TBM manufacturer
Relevant Web Sites
Relevant Publications
- Risk Modelling with Bayesian Networks - Case Study: Construction of Tunnel under the Dead Vistula River in Gdansk. In: Procedia Engineering, v. 196 ( 2017), pp. 585-591. (2017):
- About this
data sheet - Structure-ID
20083012 - Published on:
02/06/2022 - Last updated on:
03/06/2022