General Information
Name in local language: | Kładka Łuk Erosa |
---|---|
Completion: | 2000 |
Status: | in use |
Project Type
Structure: |
Half-through arch bridge |
---|---|
Function / usage: |
Pedestrian bridge (footbridge) |
Material: |
Steel bridge |
Location
Location: |
Gmina Niemodlin, Opole Voivodeship, Poland |
---|---|
Crosses: |
|
Coordinates: | 50° 40' 38.25" N 17° 39' 12.22" E |
Technical Information
Dimensions
main span | 67.5 m | |
total length | 68.8 m | |
deck | deck width | 4.44 m |
Materials
deck |
prestressed concrete
|
---|---|
arch |
steel
|
abutments |
reinforced concrete
|
Participants
Design
Structural engineering
Consulting engineers
Subcontractor
(role unknown)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Dynamic Amplification Factors for Footbridges – Experimental Approach. Presented at: Footbridge 2008 - Footbridges for Urban Renewal, Third International Conference on Footbridges, 2-4 July 2008, Porto, Portugal, pp. 261-262. (2008):
- Examples of newly built footbridges in Poland. Presented at: Footbridge 2002, Paris, 20-22.11.2002. (2002):
- Freyssinet cable-stayed structures. Freyssinet International, Vélizy-Villacoublay (France), 2004, pp. 46.
- Ouvrages haubanés sur l'A4. In: Freyssinet Magazine, n. 213 (January - April 2002), pp. 15.
- About this
data sheet - Structure-ID
20003981 - Published on:
24/06/2002 - Last updated on:
05/02/2016