General Information
Name in local language: | Viaducto de Arbizelai |
---|---|
Completion: | 2008 |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Cable-stayed bridge with semi-fan system |
Construction method: |
Longitudinal launching with temporary cable-stays |
Material: |
Steel-reinforced concrete composite bridge Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Mondragón, Gipuzkoa, Basque Country, Spain |
---|---|
Address: | AP-1 |
Coordinates: | 43° 2' 43.13" N 2° 30' 2.05" W |
Technical Information
Dimensions
total length | 408.72 m | |
span lengths | 37.44 m - 53.04 m - 2 x 59.28 m - 140.4 m - 59.28 m | |
number of spans | 6 | |
horizontal radius of curvature | 1 083 m | |
deck | deck width | 25.2 - 27.4 m |
girder depth | 2.65 m |
Materials
deck |
composite steel-reinforced concrete
|
---|---|
piers |
reinforced concrete
|
pylons |
steel
|
abutments |
reinforced concrete
|
Relevant Web Sites
Relevant Publications
- Ejecución del viaducto atirantado de Arbizelai. Presented at: IV Congreso de la Asociación Científico-Tecnica del Hormigón Estructural - Congreso Internacional de Estructuras, Valencia, 24-27.11.2008. (2008):
- Spanish launch marks progress. In: Bridge Design & Engineering, v. 14, n. 51 (2nd Quarter 2008), pp. 12.
- About this
data sheet - Structure-ID
20043339 - Published on:
03/02/2009 - Last updated on:
17/12/2017