General Information
Status: | in use |
---|
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
approach viaducts | ||
---|---|---|
length | 380 m | |
span lengths of approaches | 10 x 38 m | |
main bridge | ||
length | 400 m | |
span lengths of main bridge | 56 m - 90 m - 110 m - 90 m - 54 m |
Quantities
prestressing steel | 770 t |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Construction des ponts sur le Rio Guadania et le Rio Arade au Portugal. In: Annales de l'Institut Technique du Bâtiment et des Travaux Publics, n. 518 (November 1993). (1993):
- Pont sur le rio Arade. In: Sols et Structures, n. 217 (May - August 2003), pp. 3.
- About this
data sheet - Structure-ID
20010397 - Published on:
30/09/2003 - Last updated on:
05/02/2016