0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2013
Completion: 26 September 2016
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel
Canal bridge

Location

Location: , ,
Address: A1
Coordinates: 52° 19' 27.88" N    5° 3' 41.93" E
Coordinates: 52° 19' 25.48" N    5° 3' 51.26" E
Show coordinates on a map

Technical Information

Dimensions

total length 620 m
tunnel length 194 m
number of lanes 12
total width 65 m

Chronology

22 August 2016 Southern tube opened to traffic
26 September 2016 Northern tube opened to traffic

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20074996
  • Published on:
    10/04/2018
  • Last updated on:
    10/04/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine