General Information
Completion: | 1996 |
---|---|
Status: | in use |
Project Type
Structure: |
Deck arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Reinforced concrete bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Construction method: |
Cantilever construction using temporary cable-stays |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
total length | 270.000 m | |
number of lanes | 2 | |
roadway / carriageway width | min. 7.250 m | |
walkway width | 2.500 m | |
abutments | number | 2 |
arch | width | 8.00 - 9.00 m |
rise | 27.500 m | |
arch span | 180.000 m | |
thickness | 3.000 - 4.000 m | |
number of cells | 1 | |
deck | deck depth | 1.500 m |
span lengths | 3 x 16.800 m - 15.00 m - 3 x 16.00 m - 8.00 m - 24.00 m - 32.00 m - 3 x 16.00 m - 15.000 m - 2 x 14.200 m | |
deck width | 10.750 - 16.361 m | |
on-center distance between girders | 5.350 m | |
girder width | 1.000 m | |
number of longitudinal girders | 2 |
Materials
piers |
reinforced concrete
|
---|---|
arch |
reinforced concrete
|
abutments |
reinforced concrete
|
piers on arch |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
Relevant Publications
- 青葉大橋の施工-鉄筋コンクリート固定アーチ橋 (Construction of the Aoba Bridge). In: Concrete Journal (JCI), v. 33, n. 10 ( 1995), pp. 30-36. (1995):